PositionHome >>  ABOUT US >>  Histroy >> 

HISTORY

 

 

 

1995

 

Approved by the Fujian Foreign Trade and Economic Cooperation Commission in October

 

 

1998

 

The first tinplate production line was put into operation

 

 

2005

 

Production line speed-up transformation capacity reached 150,000 tons

 

 

2008

 

The production line has once again accelerated the production capacity to reach 170,000 tons.

 

 

2016

 

The 2nd production line being established,The total capacity of two lines is 340,000 tons.

 

 

2019

 

Chrome-plated iron officially put into operation

 

 

FOLLOW US

 

Chinese mobile English mobile
Copyright © 2018  Fujian Sino-Japan Metal Corporation  All rights reseverd  Min ICP 09052343-1 Powered by RUIDE